On 19 December, the world’s current largest unit capacity 2×660MW CFB Boiler Project with lower calorific value coal initiated the three main equipment supply contract signing ceremony in DEC Science and Exhibition Center.
 
Leaders and representatives from each party presented at the said ceremony. Mr. Wen Shugang, President of DEC Ltd. addressed the ceremony, he mentioned that after the successful operation of the world’s first ever CFB 600MW demonstration project in Baima, Sichuan province, DEC has managed to sign a higher level project with equipments for 660 MW CFB Boiler at Pingshuo. Hereupon, DEC promised to closely abide by the contract, comprehensively undertaking the manufacturing, commissioning and installation work, thereafter establishing the prototype project for the 2×660MW Boiler Project with lower calorific value coal.
XML 地图 | Sitemap 地图