On September 4, 2012, the EPC contract for ULOG Hydropower Plant was signed between EFT and Sinohydro in Beijing. As the nominated sub-contractor, DECL (Dongfang Electric Corporation Ltd.) will supply the complete electro-mechanical equipment for this project.

ULOG Hydropower Plant is located on the Neretva River in Bosnia and Herzegovina. The total installed capacity of this plant is 35MW and the construction period is 42 months.

XML 地图 | Sitemap 地图